Assembly of ski seater. At this point I would like to thank Barrie for providing me with the skis and the seat and backrest. I might add that the quality of these parts are second to none so if you are looking for a new seat, I suggest you contact Barrie. I would also like to thank Bruce for providing me with the new ski runners for the skis.
- Attachments
-
- IMG_5289.JPG (59.36KiB)Viewed 9223 times
-
- IMG_5296.JPG (59.85KiB)Viewed 9223 times
-
- IMG_5295.JPG (54.35KiB)Viewed 9223 times
Re: Next 444 Project
Nice pictures.I have to start posting some of my pics. Good to see other 444s. Mine doesn`t have hole in the front for a head light. Going to have to fix that problem. Could you tell what size is the original hole.
I see there is some type of keeper ring for the tail light.
I see there is some type of keeper ring for the tail light.
Bring on the snow
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
head light ring measurement and head light bezel
- Attachments
-
- IMG_5416.JPG (42.98KiB)Viewed 9209 times
-
- IMG_5415.JPG (51.47KiB)Viewed 9209 times
-
- IMG_5413.JPG (52.67KiB)Viewed 9209 times
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
Thankyou. Every bit of info I can get has been very helpful. Randy.
Bring on the snow
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
Randy did you read the PM I sent to you regarding the light ring and mount ?
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
Made some more progress this weekend. The handle bars are prepped and ready to install to the main frame. So on the handle bars I installed the gas tank, new hand levers, new brake cable, new ignition and light switch, and installed the decal kit. Installing all these components prior to installing the handle bars on the chassis was so much easier than doing it all after installing the handlebars. Peening the new rivets for the hand controls was so much easier doing this with the handlebars upside down. As was installing the gas tank and switches. I also pre- wired the switches before installing them as well. I also coded the electrical connections on both switches with dialectric grease as a precaution for keeping moisture and corrosion out of these switches So at this point, the handlebars are ready to be installed but before I do this, I am going to install the jack shaft, brake assembly, drive train, and chain guard then I will install the handlebars. So I will try and post pictures in order but it might not turn out that way lol!
- Attachments
-
- IMG_5325.JPG (64.71KiB)Viewed 9189 times
-
- IMG_5323.JPG (57.79KiB)Viewed 9189 times
-
- IMG_5324.JPG (50.91KiB)Viewed 9189 times
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
Pre-wiring the switches and installing decals and this is the dialectric grease I used on the switches.
- Attachments
-
- IMG_5458.JPG (41.89KiB)Viewed 9189 times
-
- IMG_5456.JPG (53.2KiB)Viewed 9189 times
-
- 5457.jpg (51.59KiB)Viewed 9189 times
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
This photo shows the newly installed decal kit on hood and handlebars.
- Attachments
-
- IMG_5459.JPG (49.4KiB)Viewed 9189 times
-
- IMG_5455.JPG (47.1KiB)Viewed 9189 times
- snocatpete
- Posts:376
- Joined:Sun Feb 07, 2010 8:39 pm
Re: Next 444 Project
The following photos are an update on my progress. New skids are installed, wheels are installed, jackshaft and new drivechain installed, and new snow flap installed. Wheels and jackshaft all have brand new bearings!
- Attachments
-
- IMG_5349.JPG (59.72KiB)Viewed 9149 times
-
- IMG_5354.JPG (66.66KiB)Viewed 9149 times
-